Translations 1

English (en-US)

Name

S-10 Truggy Part III

Overview

One of our most over-the-top and most popular builds returns to the fabrication shop when our Xtreme team jumps back on our truck-buggy combo we're calling our Truggy. All the fabrication will be completed on the chassis including welding, radiator mounts and more. Plus our bulletproof Rockwell axles become "bomb-proof" with 45 spline 2 inch axle shafts, 8 lug conversion with disc brakes. Then it all gets torn down at the end of the show so the chassis can be powdercoated.

You need to be logged in to continue. Click here to login or here to sign up.

Can't find a movie or TV show? Login to create it.

Global

s focus the search bar
p open profile menu
esc close an open window
? open keyboard shortcut window

On media pages

b go back (or to parent when applicable)
e go to edit page

On TV season pages

(right arrow) go to next season
(left arrow) go to previous season

On TV episode pages

(right arrow) go to next episode
(left arrow) go to previous episode

On all image pages

a open add image window

On all edit pages

t open translation selector
ctrl+ s submit form

On discussion pages

n create new discussion
w toggle watching status
p toggle public/private
c toggle close/open
a open activity
r reply to discussion
l go to last reply
ctrl+ enter submit your message
(right arrow) next page
(left arrow) previous page

Settings

Want to rate or add this item to a list?

Login